Solutions for Fleet Operators

Stop paying peak-rate electricity for off-peak driving

ChargeVyne gives fleet operations managers real-time control over when, how fast, and at what electricity price every vehicle charges — without touching a single departure time. We are a software overlay on your existing OCPP chargers and CPMS. We do not sell charge points, install grid connections, or provide DSO grid services.

Request a depot assessment
How ChargeVyne helps fleet operators

Four problems we solve before your first departure

Demand charge reduction

ChargeVyne spreads charging load across the night according to grid tariff windows. Our constrained optimiser ensures your site never draws more than its transformer limit — eliminating the peak demand spikes that inflate your electricity bill.

Departure readiness guarantee

You set each vehicle's departure time and minimum SoC. ChargeVyne's scheduling engine works backward from that constraint — every vehicle hits its target SoC with a buffer to spare, even if a vehicle arrived late or plug-in was delayed.

OCPP hardware compatibility

Your existing chargers become smart charging infrastructure overnight. ChargeVyne uses OCPP 1.6 SetChargingProfile and OCPP 2.0.1 smart charging commands — no hardware replacement, no CPMS migration required.

Cost attribution per vehicle

Every kWh is logged against a vehicle ID, charge point, and EPEX SPOT tariff rate. Generate per-vehicle, per-route, or per-depot cost reports for finance teams without manual data reconciliation.

Pilot data

Results from early depot deployments

Numbers from ChargeVyne pilot deployments with fleet operators in Germany and the Netherlands. Results vary by depot mix, tariff zone, and transformer headroom — we model your specific depot before any commitment.

29%
Typical reduction in depot electricity cost (pilot average)
€0.04
Average per-kWh saving vs. unmanaged flat-rate charging
100%
Departure SoC target hit rate across all pilot nights
<4h
OCPP integration time to first optimised schedule
Get started

Ready to cut your fleet electricity costs?

Our team will model the exact cost reduction your depot can expect based on your current charging pattern, tariff, and transformer capacity.